We are engaged in supplying the finest quality array of Blue Metal Chip, powder dust, Wet mix, M-Sand, P-Sand for the purposes of Laying of roads, Bridge & road construction e.t.c.
For WMM construction the following three materials are used. Aggregates used are of the smaller sizes, varies between the 4.75 mm to 20 mm sizes and the binders(stone dust or quarry dust having PI(Plasticity Index) not less than 6%) are premixed in a batching plant or in a mixing machine. Then they are brought to the site for overlaying and compaction. Comparison of the WBM and WMM road construction: Although the cost of construction of the WMM is said to be more than that of the WBM sub-base and bases but the advantages given below will compensate for that. For example, the WMM roads are said to be more durable.
M-Sand
P-Sand
Dust
Chips
Boulders
Copyright @ 2024 Golden Timbers | All Rights Reserved